About Project
- New Concrete Slab for Recycling Plant Facility at Chatham Docks
- Saw Cut and Break out Existing Tarmac within warehouse shed
- Excavate to sub base Level for Slab 250mm deep
- Supply all plant, labour and materials.
- Value Engineering to supply concrete with propex synthetic fibre reinforcement, in lieu of A393 Fabric mesh, saving time and cost placing and fixing mesh.
- This offered the client a cost saving for the works.