    • New Concrete Slab for Recycling Plant Facility at Chatham Docks

    • Saw Cut and Break out Existing Tarmac within warehouse shed

    • Excavate to sub base Level for Slab 250mm deep

    • Supply all plant, labour and materials.

    • Value Engineering to supply concrete with propex synthetic fibre reinforcement, in lieu of A393 Fabric mesh, saving time and cost placing and fixing mesh.

    • This offered the client a cost saving for the works.